US$ 5500.00
and institutional installations requiring a reliable low-voltage power source
Power Consumption - Sleep: 28mA
Note: This product is non-returnable and non-refundable
Rubber pads
this swing-away style boom is built to ensure smooth operation
BD Loops 4' x 10' Preformed Direct Burial 28 Foot Loop FAS-CHAIN#40 and institutional installations requiring aBD Loops 4' x 10' Preformed Direct Burial 28 Foot Loop Used for installations under concrete, asphalt, pavers, or in gravel roads. The most common installation is the loop tied directly to the rebar before concrete is poured. The wire is designed for a direct burial application. Unlike loops wrapped through PVC, The BD Loops Direct Burial Loop does not have an air pocket resulting in fewer repeat service calls due to phantom detections caused by
US$ 5500.00
US$ 3950.00
US$ 14.99
US$ 8450.00
US$ 6700.00
US$ 11700.00