US$ 2885.00
freight yards
L&CR had included proposals for combined international and domestic stations at Stratford and Ebbsfleet in its tender document
This allowed for smoother running and with the primary coil springs and hydraulic dampers the coaches were able to run smoothly at 125mph instead of the limited 100mph from the MK2s
Since its first appearance
Fully decorated and ready to place in your wagons or as a scenic accessory
376-276B LNER Thompson Brake Third Corridor BR Crimson & Cream No. E1931E Brand_Faller freight yardsEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
US$ 2885.00
US$ 59.00
US$ 1600.00
US$ 555.00
US$ 2400.00
US$ 1100.00
US$ 159.00
US$ 1600.00
US$ 2400.00
US$ 1900.00
US$ 59.00
US$ 450.00
US$ 99.00
US$ 89.00
US$ 109.95